A credential workflow should establish which evidence was reviewed, for whom, against which requirement and for what period. Site access is a separate authorization based on current project rules. A card image, training record or badge scan alone does not prove competence, attendance or permission to perform a task.

Define requirements by person and activity

Identify the site, employer, role and activity to which each requirement applies. Distinguish induction, training, licensing and equipment-specific qualifications rather than treating all documents as interchangeable. Confirm requirements from current governing sources and the responsible project team. A worker allowed to enter for a meeting may not be authorized to operate equipment. Keep the scope of the resulting decision visible so a general access approval cannot be mistaken for permission to undertake every activity.

Verify identity and source evidence

Preserve submitted documents and extracted fields, then route verification to authorized reviewers using approved sources. Resolve inconsistent names or unclear expiry dates explicitly. A readable photo is evidence of a submitted image, not proof that the credential is authentic or belongs to the person presenting it. AI can flag discrepancies and prepare review tasks. Record who checked what and when, and leave unverifiable evidence pending rather than letting a confidence score stand in for verification.

Separate review from gate authorization

Use distinct states for submitted, reviewed, accepted for a stated requirement and authorized for site access. Record effective dates and any restrictions. An induction attendance record might satisfy one prerequisite while other checks remain incomplete. If a temporary exception is permitted, require a named decision owner and expiration. Avoid a single permanent approved badge that follows a person between unrelated projects, because the receiving project may have different requirements or a different authorized approver.

Make revocation reach the actual gate

Changes in assignment, expired evidence or withdrawn authorization need a defined review and access-update process. Confirm that the gate system received the intended change. A source database can say revoked while an offline reader still permits entry. Establish a practical fallback for outages and ambiguous identity checks under the site’s approved procedure. Keep access events separate from payroll records; entering a gate does not independently establish the full hours worked or how they should be paid.

Test edge cases and limit data exposure

Pilot an expired credential, a duplicate person record, a corrected name and an offline gate. Measure unresolved verification cases, access decisions missing evidence and delay between revocation and gate confirmation. Restrict sensitive records so gate staff see the decision information they need without unrestricted access to personal documents. Retain history according to applicable requirements. Review whether alerts produce timely action, rather than merely generating a larger stack of notifications nobody owns.

The OSHA Outreach Training Program explains the scope and limitations of its training cards; project access decisions require additional context.

Keep building your understanding

Start with one useful workflow.

Tell us what happens today and where it gets stuck. We’ll help define a practical next step.